Systems installation

The EWP (Elevated Work Platform) that you use to install the Bannerconda (as a retro-fit to existing poles, lighting columns, walls or pylons) should be the last cherry picker, scissor lift, or bucket truck you will need for street-pole banner change-overs. 

We supply detailed written Install Instructions and are always on call to offer phone or email assistance. After Council’s Maintenance team or local Contractors have installed the systems, any staff member will be able to change banners any time you wish.
 

PRIOR to

ATTACHMENT

If using an Energy-owned pole:

Please check their Network Standards and abide by all their guidelines.

FIXINGS
for
SUBSTRATES
Round metal poles ‘Bandit’ metal strapping and buckles
Fluted metal poles Appropriate chennel nuts for indented poles
Timber poles Tek screws
Masonry walls Chemset w. bolts and/or metal backing plates

plus

BASIC
TOOL
KIT

minimum
required

tape measure marker pen or pencil box cutter knife
screwdriver set multi-grips hammer
10M rope Rope Stow Box key pliers
plumbers’ tape long Allen keys: 4mm and 5mm
[ Bandit tool ] 1.2M long buckled webbing tie-down strap

Recent Posts